It’s a Saturday morning. We both have our calendars on the table. I’m taking notes on a piece of green scrap paper.
We’re making a to-do list and comparing it against our (busy) schedules. That’s been one of the challenges during this process. We’re able to do some of the work on our own, but some of it can only be done with an extra pair of hands, which is why we have Work Days. And a list to keep us on track. And the weather app to govern what tasks get done on what (sunny/rainy) day.
We’re six weeks into the Trailer Rehab project and I’m calling this our Master List. It’s hopefully one of the last we’ll make in this rehab process.
Today’s list: paint the bathroom; replace the bathroom floor; go to the dump; take a trip to Home Depot.
Monday has its own list. So does Jan. 10th. There’s a research list too.
Here’s a peak into the work in the bathroom.
This ugly thing had to go. So I ripped it off the wall.
And then I primer-ed it.
Sometimes, in the scope of the grandeur of the project, I have to do small things. Like installing the rest of the decorative door knobs on the cabinets.